雙組份打膠機(jī)的安裝順序是什么樣的?
時(shí)間:2022-02-24 來(lái)源:http://m.njguanglong.com/ 發(fā)布人:昌盛機(jī)械
1、雙組份打膠機(jī)設(shè)備應(yīng)安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設(shè)備一致,當(dāng)然如果條件達(dá)不到至少爭(zhēng)取無(wú)腐蝕性氣體,畢竟設(shè)備中有電線以及管路這些配件抗腐蝕性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室內(nèi)溫度更好控制在10~40度的室內(nèi)堅(jiān)硬地面上,地面應(yīng)水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設(shè)備在設(shè)計(jì)之初已經(jīng)考慮到了地面復(fù)雜性的因素所以對(duì)地面平整度是有相當(dāng)大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the indoor hard ground of 10 ~ 40 degrees, and the ground should be better leveled. (the ground levelness mentioned here must be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so we have a considerable tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
3、雙組份打膠機(jī)安裝之前,應(yīng)先檢查是否有因運(yùn)輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶在移動(dòng)打膠機(jī)的過(guò)程中把設(shè)備的智能控制系統(tǒng)的一個(gè)零部件碰掉了而導(dǎo)致設(shè)備無(wú)法正常運(yùn)行,我們的工作人員到現(xiàn)場(chǎng)后才排查出的原因。
3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, which led to the failure of the equipment to operate normally. Our staff found out the reason after arriving at the site.
4、我們可以根據(jù)地面平整度的實(shí)際情況來(lái)通過(guò)調(diào)整設(shè)備的可升降地腳螺栓來(lái)調(diào)整設(shè)備的水平度直到設(shè)備水平而穩(wěn)固。然后按圖接線并可靠接地,把氣源接入機(jī)器所配帶的氣源接口,確保無(wú)漏氣現(xiàn)象。
4. Firstly, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and reliably ground, and connect the air source to the air source interface equipped with the machine to ensure no air leakage.
5、向油槽中加注液壓油至指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設(shè)備是否能夠正常運(yùn)行。
6. Turn on the power and turn it on to see if the device can operate normally.
以上就是今天帶給大家的知識(shí),雙組份打膠機(jī)專(zhuān)注行業(yè)多年,為用戶不斷的提供有價(jià)值的內(nèi)容,更多內(nèi)容請(qǐng)繼續(xù)關(guān)注我們:http://linshi.jncsjx.com
The above is the knowledge brought to you today. The two-component gluing machine has focused on the industry for many years and continuously provides users with valuable content. Please continue to pay attention to us for more content: http://linshi.jncsjx.com
- 全自動(dòng)鋁條折彎?rùn)C(jī)技術(shù)在哪方面提升了 2025/04/19
- 全自動(dòng)封膠線有什么技術(shù)優(yōu)勢(shì)? 2025/04/18
- 中空玻璃生產(chǎn)線成本高,怎么選性?xún)r(jià)比高的? 2025/04/15
- 驗(yàn)收時(shí)才發(fā)現(xiàn)玻璃自爆,工期延誤賠償百萬(wàn)? 2025/04/14
- 中空玻璃加工設(shè)備的講解 2025/04/12
- 毛刷式清洗機(jī)怎么使用 2025/04/11
- 中空玻璃加工設(shè)備核心是什么? 2025/04/10
- 全自動(dòng)鋁條折彎?rùn)C(jī)如何設(shè)置更快,讓編程更簡(jiǎn)單? 2025/04/09
- 雙組份打膠機(jī)讓膠水發(fā)揮最大威力 2025/04/08
- 臥式丁基膠涂布機(jī)的優(yōu)勢(shì)有什么 2025/04/07
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們: